Mineral Hill – Gold Mine Restart
Service: TSF Reclaim System Design, Plant Control System Design, MCC, Prep Tank, CIL Thickening, CCCW Area, Oxygen Generation & Injection, Detox Thickening
Mineral Hill – Gold Mine Restart
Mincore was engaged to deliver eight work packages for the re-start of the Mineral Hill Gold Mine in Condobolin, NSW. The plant re-treated the tailings from the tailings storage facility for a duration of approximately two years. The re-start required the plant to be reconfigured to treat the tailings; accordingly, six new equipment packages were designed, fabricated, installed, and commissioned.